Service
Underground Microduct Installation
Microduct placed from the distribution point to the home, bored under driveways, walks and landscaping so nothing has to be trenched open and put back.
Solutions
The build changes depending on what you are connecting. A single home, a 200-unit tower, a rural route and a network node do not get the same crew, the same pathway or the same close-out. Pick the one you are working on.
Street to the side of the house, then into it. Driveways, sidewalks and irrigation stay where they are, because the pathway goes under them instead of through them.
Service
Microduct placed from the distribution point to the home, bored under driveways, walks and landscaping so nothing has to be trenched open and put back.
Service
Microduct lashed to existing strand or pole line, built to the clearances and attachment standards the pole owner requires.
Service
Fiber jetted or pulled through the placed duct to the demarcation point, kept inside bend radius and tension limits the whole run.
Service
Drop and distribution cable hung pole to pole or mid-span, with slack storage set where the splice crew will actually need it.
Garden apartments, mid-rise and high-rise. Getting to the building is the easy half; getting up the riser and into every unit is the job.
Long routes, few structures and a lot of ground between them. Footage per day is what decides whether the job makes money.
The end of the route, where everything terminates and gets tested. Tight spaces, live equipment and no room for a mistake.
Campuses, warehouses and offices. Building to building outside, riser and horizontal inside, on a schedule that works around the tenant.
Whichever segment the job falls in, these six are done by our own crew on our own equipment. Nothing is brokered out and re-marked up, which is why the schedule holds and the close-out package is complete.
01
Road, driveway and canal crossings without cutting the surface.
02
HDPE and PVC placement, handholes, vaults and concrete encasement.
03
Air-assisted placement through new or existing duct, to carrier spec.
04
Ribbon and single-fiber splicing, terminations and closures.
05
Bi-directional testing, loss budgets and redline drawings on close-out.
06
Wall and slab penetrations, wet-cored, sealed and patched.
Every job ends with the same package, whether it is one drop or a full subdivision backbone. Your inspector, your carrier and your lender all ask for the same four things, so we build them as we go instead of reconstructing them afterward.
01
Every span, every wavelength required, with the event table.
02
Measured loss against the design budget, span by span.
03
Bore profiles, depths, structure locations and route changes marked.
04
811 tickets, permit close-outs and daily MOT records.
Footage, soil, crossings and a date. We price it and tell you when we can be on site.