About

One crew from the bore to the splice

Most underground work gets split between a drilling outfit, a cable crew and a splice tech from three different companies. When the loss number comes back wrong, nobody owns it. We put all three under one license.

LicensedFla. Lic. [NUMBER]
InsuredGL & auto, certs on request
MOT CertifiedFDOT traffic control
811 FirstLocates before every shot

Who we are

[COMPANY PARAGRAPH — who founded it, the years of field experience behind it, and the market it was built to serve. Two or three sentences, first person plural, no adjectives you cannot back up.]

Core Bore & Splice is a Florida underground utility and fiber contractor working for developers, general contractors, carriers and municipalities. We drill the path, place the conduit, put the cable in it, splice it and hand over the test report that proves the span.

How we work

01

We self-perform

Our crew, our rigs, our splice trailer. No brokered labor and no second markup buried in the bid.

02

We locate first

811 tickets on every shot, potholing where the plan and the ground disagree. A struck line costs more than a slow morning.

03

We test what we build

Bi-directional OTDR on every span. If a splice is out of budget, we find it before you do.

04

We close out clean

As-builts, traces, permits and locate records handed over with the invoice, not chased for a month.

05

We leave the site right

Fluid hauled off, restoration done, patch finished. The last impression is the one the inspector remembers.

06

We answer the phone

One point of contact for the bid, the schedule and the problem at 6 a.m. on a Saturday.

Safety and compliance

Every crossing runs on 811 locates and, where the plan and the field do not match, potholing before the drill turns. Traffic control follows the FDOT standard with certified MOT on the job. Certificates of insurance go out the same day you ask for them, and we carry [COVERAGE LIMITS] in general liability and auto.

Licensed in Florida under [LICENSE TYPE AND NUMBER]. [ADD: OSHA 10/30, confined space, CDL, or any carrier or municipal qualification once those are in hand.]

Equipment

[EQUIPMENT LIST — drill rigs by make and size class, vacuum excavator, splice trailer, fusion splicer and OTDR models. Buyers check this line to see whether you can actually do the footage you are bidding.]

Send us the plans.

Footage, soil, crossings and a date. We price it and tell you when we can be on site.